巖棉板制造商的外墻保溫施工過程主要包括:基礎(chǔ)處理,膠粘劑配置,固定裝置,底部抹灰砂漿,耐堿網(wǎng)眼布,表面抹灰砂漿,保溫系統(tǒng)驗(yàn)收和裝飾層施工。我們的齊工
巖棉板廠家今天要談?wù)摰氖钦迟N巖棉板的過程。
The external wall insulation construction process of rock wool board manufacturer mainly includes: foundation treatment, adhesive configuration, fixing device, bottom plastering mortar, alkali resistant mesh cloth, surface plastering mortar, insulation system acceptance and decorative layer construction. Our Qinghai rock wool board manufacturers today to talk about the process of sticking rock wool board.
齊工巖棉板
1.粘貼時,從底部到頂部用粘結(jié)砂漿鋪砌巖棉板。巖棉板的長邊在水平方向上放置和粘貼。垂直接縫應(yīng)逐行錯開1/2線,且板長等于或大于200mm。
1. When sticking, place rock wool board from bottom to top with binding mortar. The long sides of the rock wool board are placed and pasted in a horizontal direction. The vertical joints shall be staggered 1/2 line by line and the length of the plate shall be equal to or greater than 200mm.
2.墻角兩側(cè)的巖棉板應(yīng)錯開重疊,并應(yīng)確保墻角的垂直性。
2. The rock wool boards on both sides of the corner shall be staggered and overlapped, and the perpendicularity of the corner shall be ensured.
3.開口(如門窗)的四個角應(yīng)切成整塊巖棉板,不要拼接。巖棉板的接縫與開孔四個角之間的距離應(yīng)大于200mm,開口四側(cè)其他巖棉板的寬度應(yīng)不小于200mm。
3. The four corners of openings (such as doors and Windows) should be cut into a whole rock wool board, do not join. The distance between the joint of the rock wool board and the four corners of the opening shall be greater than 200mm, and the width of the other rock wool board on the four sides of the opening shall be no less than 200mm.
4.均勻地按壓巖棉板,使其完全粘附在基礎(chǔ)層上。粘結(jié)砂漿的壓實(shí)厚度盡量控制在3mm之內(nèi)。
4. Press the rock wool board evenly to make it adhere to the base layer completely. The compaction thickness of bonding mortar should be controlled within 3mm as far as possible.
5.隨時使用2m斜尺和電線支架檢查平面度和垂直度,如果不符合要求,請立即進(jìn)行校正。
5. Use 2m inclined scale and wire bracket to check the flatness and perpendicularity at any time. If it does not meet the requirements, please correct it immediately.
6.立即刮下板縫和板側(cè)面之間的殘留砂漿。
6. Immediately scrape off the residual mortar between the seams and the sides of the board.
7.巖棉板之間的間隙應(yīng)控制在1.5mm之內(nèi),接頭之間的高度差應(yīng)控制在1mm之內(nèi)。如果接頭的寬度超過1.5毫米,則可用適當(dāng)寬度的巖棉板條填滿縫隙,注意不要讓板條粘住。
7. The gap between rock wool boards should be controlled within 1.5mm, and the height difference between joints should be controlled within 1mm. If the width of the joint exceeds 1.5 mm, rock wool slats of appropriate width may be used to fill the gap, taking care not to allow the slats to stick.